CENTRALIZED SEWAGE TREATMENT PLANT – JCSTP – BOO PROJECT,
JAZAN ECONOMIC CITY
Jazan is located in the Kingdom’s southwest region, and in 2014 the Saudi Aramco Oil Company began constructing the Jazan Refinery and Terminal. The facilities form the industrial heart of the government’s greater Jazan Economic City project.
BOO PROJECT CENTRALIZED TREATMENT PLANT – JCSTP
During development and construction of this project a waste water treatment concept was required. The centralized waste water treatment plant JCSTP is designed to receive domestic waste water through tanker trucks from the Aramco contractor’s camps. It has a treat¬ment capacity of 5,400 m³/day.
Scope of MENA-Water
MENA-Water provided the design, supply, installation and commissioning with start-up for the complete plant. The client for this project was FK & Partner Co.
Included in the scope of works were tanker station, lifting pumps, screening, grit removal, aeration tanks and containerized MBR packages including all measuring instrumentation. Storage tanks for treated water and for sludge, including drying beds for sludge dewatering are completing the treatment. more Information
at Download
The entire plant is operated by PLC and observed through an online monitoring system 24h x 7d. Start-up was in October 2016.
Scope
Equipment | Application |
Screen | Screening removal |
Grit & Grease Trap | Sand, grease & FOG removal |
Mixer and Aeration System | Biological treatment |
MBR Package Plants | Filtration |
Blowers | Aeration and scouring |
Pumps | Flow control pumps and Service water pump |
Sludge Removal | Sludge drying beds |
Instrumentation | Flow, level (hydrostatic), TSS, DO, pressure control |
MCC and PLC | Complete auto control |
Generator | Power supply |